How Puratos Standardized Maintenance across 65 Production Sites
As an international manufacturer of ingredients for the bakery and chocolate industry with 76 production sites in 52 countries, Puratos needed a unified maintenance solution. With the osapiens HUB for Maintenance directly integrated with SAP PM, the company standardized maintenance processes globally, eliminated paper-based workflows, and achieved measurable productivity gains: 12 minutes saved per work order and 5 minutes per planning activity.